Preloader Close
Our Projects
  • Delivered digital solutions for reservoir modeling and production optimization for Elcrest E & P Limited at OML 40.
  • Supplied technical expertise for the deployment of water injection systems to enhance recovery for First Hydrocarbon Nigeria at OML 26.
  • Assisted in the development of production-sharing agreement frameworks for SPDC at OML 25.
  • Developed robust access roads to connect production facilities with key transportation hubs for Heritage Oil at OML 30.
  • Designed and built protective embankments for Alfa Designs Nigeria Ltd at OML 119 to mitigate erosion risks near oil facilities.
  • Conducted security vulnerability assessments to ensure compliance with industry best practices for Aradel Energy at OML 34.
  • Implemented multi-layered security systems, integrating fencing with real-time monitoring solutions for Aradel Energy at OML 53 (Omerelu field).
  • Supplied high-pressure valves and flanges for critical pipeline systems at Oando Energy Resources at OML 60.
  • Delivered safety equipment and personal protective gear for field personnel for SPDC at OML 20.
  • Delivered technical design solutions for upgrades to gas compression facilities for Neconde Energy at OML 42.
  • Executed pipeline integrity assessments to identify and rectify flow bottlenecks for Shell Nigeria Exploration and Production Company (SNEPCO) field workers at OML 118.
  • Developed spill response protocols and provided training to field teams at Seplat Energy OML 53.
  • Provided consultancy on community impact mitigation strategies during asset development for Heritage Oil at OML 30.
  • Organized workshops on advanced drilling technologies for local engineers for FHN at OML 26.
  • Construction and installation of 1100m of Citadel high security fence at UKI Facility, After Okhakue River, Benin-Agbor Express Road, Abudu, Orhiomwon, Edo State
  • Construction of 900m high Security C-Thru mesh Fencing at Amoni integrated Farm industries Ltd, Fugar, Etsako Central, Edo State
  • Skyhomes Limited Lekki-Tesa Smartair wireless access Control
  • Victoria Crown Plaza Hotel, Victoria Island, Lagos-Tesa Hotel Lock Access Control System
  • Construction/Resurfacing of Dickson, Iheoma, Odunze, Ataba, Owhonda, Ihute, Umuduru Streets and Redeem Close in Mile III Diobu, Port Harcourt
  • Design of 180 Tonne Capacity Sand Hopper and associated Structures for Ashaka Cement PLC, Ashaka, Gombe State

  • Offshore Support Services: in 2011 EEGR signed a four (4) year Joint Venture Agreement with the Nigeria Sao Tome and Principe Joint Development Authority (JDA) to provide offshore support services for all operating IOCs within the Joint Development Zone (JDZ). These services include Provision of Platform Supply Vessels (PSV), Fast Support Intervention Vessels (FSIV), Offshore Supply Vessels (OSV), Anchor Handling Tug Supply Vessels (AHTS), Crew/Utility Boats, Helicopter Transportation, Bunkering Services and ROVs